Certified AI Project Management Professional
Credential designation AI-PMP
Plan, estimate, govern and deliver projects with machine learning or generative AI components, where scope depends on experiments and the product keeps changing after go-live.
What you will be able to do
- Structure an AI project in stages with go and no-go gates tied to evidence
- Estimate work whose outcome depends on experiments and data quality
- Build a risk register that covers model, data and ethical risk
- Run hybrid delivery that combines plan-driven and iterative work
- Govern vendors and foundation-model services
- Hand over a live model with monitoring, ownership and retraining in place
Modules
-
1How AI projects differ
Uncertainty sits in the middle of the project, not at the start. The plan must allow for the model not reaching the target.
- The AI project lifecycle from discovery to operation
- Experiment-driven scope
- Why 'done' includes monitoring
- Typical failure points and their early signs
Exercise. Map a past project of yours onto the AI lifecycle and mark where an evidence gate would have changed a decision.
-
2Staged planning and evidence gates
Breaking work into feasibility, proof of value, pilot and scale, each with a pass condition agreed with the sponsor in advance.
- Defining pass conditions for each stage
- Time-boxing experiments
- Kill criteria and how to present them
- Benefits tracking from the first stage
Exercise. Write the gate criteria for moving a chatbot from proof of value to pilot.
-
3Estimating under uncertainty
Ranges, reference classes and option budgets in place of single-point estimates.
- Three-point and range estimates
- Reference-class forecasting
- Budgeting for data preparation and labeling
- Compute and inference cost estimates
Exercise. Produce a range estimate for a document-extraction project and state the two assumptions that move it most.
-
4Risk, quality and ethics
A risk register that covers data, model performance, drift, security, regulation and reputation, with owners and triggers.
- Model and data risk categories
- Quality planning with evaluation sets
- Regulatory awareness and impact assessments
- Incident response for model failure
Exercise. Add five AI-specific risks with triggers and responses to a project risk register.
-
5Teams, vendors and foundation models
Who you need, what to buy and how to contract for services whose behavior can change without notice.
- Roles: data engineer, ML engineer, domain reviewer, product owner
- Build, buy or adapt decisions
- Contract terms for model services: data use, versioning, exit
- Managing hybrid agile and waterfall teams
Exercise. Draft five questions to put to a vendor of a hosted language model before contract.
-
6Transition to operations
A model in production needs an owner, monitoring, a retraining plan and a budget. The project is not closed until these exist.
- Operational acceptance and runbooks
- Monitoring for drift and performance
- Ownership and RACI after handover
- Lessons learned and benefits realization
Exercise. Write the handover checklist you would require before closing an AI project.